Sign in
Guangdong Shunde Bohui Technology Co.,ltd
5YRSGuangdong Shunde Bohui Technology Co.,ltd

ŞİRKETE GENEL BAKIŞ

Şirket Albümü

Temel Bilgiler

ÜRÜN KAPASİTESİ

Üretim Akışı

Machine Manufacturing
All the parts of the machine are preparing, when all the parts are ready, the machine will start to assembly.
Machine assembly
Machine will assembly when all the parts are ready. After assembly, it will test by the technician, and the machine will run more than 24 hours.
Machine Testing
When the machine finish, we will test the completely packing line if the customer required.
Machine Packing
When the machine finish testing, we will pack it in wooden case for shipment.

Fabrika Bilgileri

Fabrikanın Büyüklüğü
3,000-5,000 square meters
Fabrikanın Bulunduğu Ülke/Bölge
Room 101-204, Building 3,Block 3, Perfect Jewelry Industry Center, No. 1 Feicui Road, Lunjiao Street, Shunde District, Foshan City, Guangdong Province, China
Üretim Hatlarının Sayısı
Above 10
Sözleşmeli Üretim
OEM Service Offered, Design Service Offered, Buyer Label Offered
Yıllık Çıktı Değeri
US$5 Million - US$10 Million

Yıllık Üretim Kapasitesi

Ürün Adı
Üretilen birimler
En yüksek
birim Türü
Doğrulandı
VERTICAL PACKING MACHINE
500
600
Set/Sets
Doğrulandı

Üretim Hattı

Üretim Hattı
Danışman
Operatör Sayısı
Sıralı QC/QA sayısı
Doğrulandı
Linear Cutting & Welding Line
10
20
10
Doğrulandı

KALİTE KONTROL

Kalite Yönetimi Süreci

Quality Inspection
When the machine finish testing, the Quality Inspection Person will check it parts by parts, and will issue one QC report.
Bag Former Testing
All the bag former or forming shoulder should be test before shipment

Test Ekipmanı

Makine Adı
Marka ve Model NO
Miktar
Doğrulandı
Testing Machine
HP-1000
10
Doğrulandı